• Don't miss out on all the fun! Register on our forums to post and have added features! Membership levels include a FREE membership tier.

Changing a Tunnel

S
Feb 4, 2008
274
32
28
Seattle wa
worth every second

took me a little less than two days. drilling the rivets takes 90 percent of the time. if you use the factory yamaha multi-grip rivets you wont regret it. it pulls the pieces together and clamps it tight. two bucks per rivet though. i was very happy with how mine came out. the only thing i might do different would be use the shorter rx-1 coolers and you could cut down the sides of the tunnel and taper it with a VE grab bar for the aftermarket tunnel look. looks similar to 09' M8. like i did to my m7 in the last photo.:beer;:beer;
IMG_1241.jpg
IMG_1239.jpg
0920091631b.jpg
 
Premium Features