Thanks, got all our pictures taken to convert to an rv and paperwork is sent to the state so as soon as our title comes back all the junk in the rear is coming out. We built a wall between the sleds, sealed air tight and it keeps all the gas and exhaust out of the cockpit. Also on the bottom we made a 3/16 steel "c" where the bottom leg is about 18" and is sealed and bolted through the floor to catch the sleds if a bad situation arises. I feel pretty confident they won't get through it but we have always tied the sleds down before and plan to in this as well.
We still have a bunch of little things to finish but just about ready. Biggest thing to do yet is glue the rear floor and get the ski guides in. Then it's just building storage and wiring up all the outlets/ tv/ cameras etc. We also want to get an on board av gas tank mounted under the bus sometime but might have to do cans until we figure out how we want to do it.
I realized you might not be able to see the wall in the other pictures so these show it a little better and also how we ended up doing the rear door.
Sent from my SAMSUNG-SM-G930A using Tapatalk