So here is a break down of what a sled like this would cost to build.
Anyone can say "oh I could build a sled like that for $10g" or whatever...If you know what your actually talking about the numbers might end up being a little different then you think.
2009 Yamaha Nytro $11500
Turbo Impulse Nypex kit $8800 Standalone fuel system 600 cc injectors gt3071 turbo Mid-mounted Garrett Gt 3071r hybrid turbo Tial V-Band stainless turbine housing Short, responsive 3 into 1 V-Band st
ainless header 3" stainless V-Band turbo downpipe Tial V-Band 38mm external wastegate Separate 1 3/4" wastegate downpipe High flow intercooler Tial Q 50 mm blow off valve Standalone fuel injection controller, all stock ecu/harnesses ect are gone. This is a full engine standalone from complete custum timing maps to complete custum fuel maps. IAT sensor, Coolant sensor
Engine Apex engine Cams $1300 Heavy duty valve springs $450 Arp Head studs $300 custum forged/stroker pistons $900 Carrillo Rods $1600 Steel sleeved block $1200 stroked crank $1400 ported head $900 Cam timing misc gaskets/bearings $500
Clutching: Supertip weights $250 Dalton Helix $150 BWB spring $30 Cutler secondary spring $30 Avid drivers $250
Suspension/Chasis: CR 174" tunnel $1650 CR 174" M-10 $4000 8" billet wheels $200 174x16x3" track $1500 Impulse front cooler mod to fit 3" track
Other: Prologger $700 Assault seat $550 CR Racing Steering Post $220 CR Racing Yamaha billet throttle block $80 MSD Ignition coils $400 8" billet risers $150 Skinz handlebars $160 ODI grips $30 Custum break master cylinder $150
Bling: Professional polish-cr rails, surge tank, risers, cr side plates, intercooler, intercooler brackets, thermestat housing, and other...$600 Professional Chrome-M10 front and rear mounting arms, front upper and lower a arms $400 Professional powdercoat-Everything that isn't polished of chromed is powdercoated. I mean EVERYTHING tunnel, steering hoop, steering post, foot rests, front clip, oil bottle,valve cover, chain case cover, crank case vent cover, magneto cover, way more then I want to list... Little things even down to the little fuse mounting bracket. $1000
Total $40400
Price does not include labor which is easily 50 hours