Two Phazer build

H

Holomis International

Well-known member
Nov 29, 2008
754
64
28
www.holomis.com
We wanted to get the motor closed up so we proceeded with cleaning the engine side mating surface. Then we cleaned the engine side cover mating surface. Once we cleaned everything really well, removing the old gasket, we applied some silicon in the 3 required areas and then installed the new factory gasket. We then installed the PTO extension through the engine side cover, and got the engine side cover mounted in place. Once everything was lined up with installed all of the engine side cover allen bolts and torqued them down to spec. We then installed the new longer supplied PTO extension bolt and torqued it down as well. That completed our engine cover installation. From there we got back to our tunnel.

IMG_2732.jpg IMG_2870.jpg IMG_2871.jpg IMG_2872.JPG IMG_2894.jpg
 
H

Holomis International

Well-known member
Nov 29, 2008
754
64
28
www.holomis.com
Now that we have the engine side closed back up we want to get on to finishing the tunnel, that way we can continue on with the Supercharger install when the tunnel is off at powder coating.

With the tunnel already formed and test fit, we now moved on to finishing the edges and final shaping, along with finishing the rear of the tunnel.

We trimmed the rear portion of the tunnel at an angle and made a filler plate. From there we welded it in place and then blended it out to look like one piece.

IMG_2784.JPG IMG_2785.jpg IMG_2877.JPG IMG_2878.JPG IMG_2880.JPG
 
H

Holomis International

Well-known member
Nov 29, 2008
754
64
28
www.holomis.com
After we were happy with the finish of the tunnel we installed it on to the factory portion of the Phazer tunnel. After several measurements we clamped it in place and then proceeded to drill two holes. We then inserted two clicko's to hold the tunnel in place.

We then formed to tunnel reinforcements, these will double the strength in the suspension area. Once we were happy with the mounting location of the reinforcements we used a clicko clamp to hold it in place while we drilled our rivet pattern. We then riveted the piece in place.

IMG_2881.JPG IMG_2882.JPG IMG_2883.jpg IMG_2885.JPG IMG_2886.JPG
 
H

Holomis International

Well-known member
Nov 29, 2008
754
64
28
www.holomis.com
With the tunnel installed we were able to move onto the running boards. You can see a picture of the reinforcement installed from the back side of the tunnel. The running boards will also be mounted through this reinforcement area as well.

We first bent up the outside rail and test fit it, we then trimmed it to size so it would fit properly on the tunnel. Notice how the outer tube ends right over top of the reinforcement plate. This will allow us to tie the entire tunnel together using the running boards.

Once we got the one side completed we simply duplicated a left hand version for the other side. It's starting to come together now!

IMG_2887.JPG IMG_2957.JPG IMG_2960.JPG IMG_2964.JPG IMG_2965.JPG
 
H

Holomis International

Well-known member
Nov 29, 2008
754
64
28
www.holomis.com
With the outside rail done, we moved on to the inside rail. Again we took this to our bender and matched the angle of the outside rail. We test fit it and then took it to our coping machine and coped it to fit nicely under the outside bar. Once we were happy with the fit we proceeded to the cross bars for the feet. The same process is done here, we cut the tubes and then set our coping machine to come at the proper angle, from there we cope the tubes and test fit them.

IMG_2979.JPG IMG_2981.JPG IMG_2986.jpg IMG_2984.JPG IMG_2982.JPG IMG_2990.JPG
 

Blown Motor

Well-known member
Lifetime Membership
Sep 20, 2012
1,427
1,016
113
Pretty sweet little build! There is a phazer for sale here locally that I was thinking of picking up to do a similar project!! Congrats on the progress!
 
H

Holomis International

Well-known member
Nov 29, 2008
754
64
28
www.holomis.com
Hey Guys

So with bitter sweet thoughts we are wanting to let everyone know that we are selling this project as it sits (we will continue to post as we work on it until it sells)

The bitter part of course is that we really would like to complete this project. The sweet part is that our golf custom golf carts are so busy that we don't have the time to complete this project.

So if there is anyone looking for a project machine with the hard stuff done then feel free to send us a PM.

It will include the sled as you see it in the pictures

- 153" track cut down to proper width
- wahl bros extrovert drivers already installed on the shaft
- the complete super charger kit
- two brothers racing black edition carbon fiber exhaust can
- nytro front end and skid shocks
- freshly covered seat in carbon fiber material

and or course all the stock pieces to go back on the sled. Whatever we have for this project will go with it.

The project is not that far off from being ready to have the skid re installed, front end painted and re installed, the Supercharger is ready to be installed, as mentioned all the tough stuff is complete.

So if there is anyone who is seriously interested in the project let us know it's going out a a screaming deal!
 